• Analytical methods for risk assessment and reduction of the uncertainty 

      Toungsetwut, Monphen (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012-06-13)
      Risk is in involved in all activities especially in oil and gas industries. It is involved from the day one the project has started. Risk during the exploration phase, the chance that you found only dry wells the company ...
    • Low salinity eor-potential for Yme at reservoir conditions : an experimental study 

      Storås, Silje (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012-06-14)
      The composition of the water injected into a reservoir affects the oil recovery. Injecting water with low salinity (LowSal) has been proved by several studies to improve the water wetness of the rock and thereby increase ...
    • The choice of procurment strategy in removal projects for Statoil 

      Aaserud Svindseth, Karin Anita (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012-12)
      56 years have gone since the first well was drilled at the Norwegian continental shelf (1). Today, many of the installations are old and no longer in use, and according to the OSPAR Convention 98/3 (2) they shall be removed. ...
    • Learning from training with the use of technical tools 

      Ove, Camilla Gjerde (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      This is a study of learning from training with the use of technical tools. This paper is written as part of the BRIDGE project. The aim of the BRIDGE project is to develop technical and organisational solutions that can ...
    • Implementering av BREEAM hos YIT i Stavanger 

      Morken, Daniel (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      I denne oppgaven vil jeg undersøke mulighetene for implementering av BREEAM-NOR hos YIT Stavanger. YIT er Norges ledende leverandør av tekniske bygginstallasjoner, og tok i bruk BREEAM-NOR i forbindelse med prosjektet på ...
    • Suggestion of a new definition of risk in the frameworks regulations: possible implications for the process of establishing fire and explosions loads to be used as a basis for design 

      Matland, Aleksander (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      The Petroleum Safety Authority Norway has suggested an update of the definition of risk in the regulations that concerns the health, safety and environment for Norwegian petroleum operations. The prevailing definition of ...
    • Performance evaluation of Skagen Kon-Tiki and some emerging market funds, with an emphasis on the funds’ performance relative to the underlying risk 

      Jakobsen, Bjarne Skeisvoll (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      The financial markets are as complex as ever due to an accelerating development in technology and complex financial instruments available to investors. This has contributed to the world becoming more financially integrated, ...
    • Veiledende metode for analysering av risiko 

      Isaksen, Eivind Johan (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      I forbindelse med de nevnte tilsynsrundene, har Arbeidstilsynet pålagt Norport handling Bergen AS avd Sola å utarbeide en risikoanalyse med påfølgende tiltaksplan [16]. Norport har ikke noe godt grunnlag for og verken ...
    • Pricing and risk management of spread options on Brent and West Texas Intermediate oil futures markets 

      Bjørnstad, Sunniva Landmark (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      This thesis investigates the price spread between futures on Brent oil from the Intercontinental Exchange and West Texas Intermediate oil from the New York Mercantile Exchange. Historical futures data is calibrated to ...
    • Strategier innen offentlige anskaffelser av IT-brukermaskinvare 

      Manojlovic, Nenad (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Bruk av klassiske mangeårige rammeavtaler med én leverandør er veldig utbredt i anskaffelser av IT-maskinvare innen offentlig sektor. En utfordring i slike avtaler er at priser og produkter partene blir enige om ved ...
    • Investigating eor for ss by low salinity water 

      Valderhaug, Ole Martin (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Water flooding has for a very long time been used to improve oil recovery, in the recent years researchers have become aware of the effects from controlling the salinity and composition of the injected water. Low salinity ...
    • Innovasjonsprosesser til oppstartsbedrifter i Inkubator 

      Risbakken, Sebastian (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Det har lenge vært en misoppfatning at oppstartsbedrifter kun er mindre versjoner av store selskaper og at dermed de samme prosessene til produktutvikling kan benyttes. Min påstand er at oppstartsbedrifter i for stor grad ...
    • Bruk av systemrisikoanalyse i tidlig fase av agile prosjekter med mål om innebygget sikkerhet 

      Wikstrand, Robert (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Agile prosjekter karakteriseres av høy grad av usikkerhet, spesielt i tidlig fase. Gjerne kan slike prosjekter ha klart definert mål, men løsningen for å nå målet er gjerne uklart. For prosjekter der målet er å ha høy grad ...
    • Usikkerhet i kostnader, knyttet opp mot store byggeprosjekter 

      Nguyen, Tien Quang (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Usikkerhet, kostnader og prosjektledelse er noen nøkkelord i dagens industri. Et interessant tema innen byggevirksomheten er overskridelser, hva disse skyldes, hvorfor disse oppstår og hva som kunne utbedres for å unngå ...
    • Vurdering av fondsmarkedet med fokus på Skagen Fondene. 

      Mjølhus, Thomas (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Det stavangerbaserte selskapet, Skagen Fondene, er kjent for å være en av de beste fondsforvalterne i det norske markedet de siste årene. Skagen har de siste 10 årene mottatt en rekke førsteklasses priser fra internasjonale ...
    • Tettstedsutvikling Slåttevik-Tysværvåg 

      Osnes, Christian Sivertsen (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Denne oppgaven tar for seg området Slåttevik-Tysvævåg i Tysvær kommune som ligger i Rogaland. Rogaland har de siste 60 årene hatt en stor befolkningutvikling og dette har lagt et stort press på arealer. Et strengt jordvern ...
    • The feasiblility of transition plans towards more bus mobility at Northern-Jæren 

      Gamaal, El-Attar (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Nord – Jæren vokser raskt med hensyn på befolkning, bedrifter og ferdsel. Det nåværende ferdselsmønsteret er hovedsakelig basert på bilferdsel. Bilferdsel forårsaker lange køer og perioder med mye trafikk og påvirker utslipp ...
    • The development of integrated operation centers 

      Nguyen, Nam-Kha (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      To face today’s challenges that especially applies mature field developments like higher rig costs, limited bed space and more performance-based tendering, the oil industry has to evolve. Integrated Operations is not a ...
    • Analyse av organisatoriske endringer i FMC Well Intervention Services (WIS) 

      Hassnain, Ali (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Denne oppgaven kaster lys på endringsprosessen som er gjennomført i FMC Well Intervention Services (WIS). Det er tre aspekter ved endringsprosessen som settes i fokus; Ledelsens håndtering av endringsprosessen, ansattes ...
    • Analyzing business process management 

      Skjæveland, Børge (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Within the Oil & Gas Industry, the market is constantly growing more competitive, forcing companies to continually adapt to changes. Companies need to cut costs and improve the business efficiency. One way of successfully ...