Vis enkel innførsel

dc.contributor.authorUrycheva, Maria
dc.date.accessioned2014-02-06T09:43:22Z
dc.date.issued2013
dc.identifier.citationno_NO
dc.identifier.urihttp://hdl.handle.net/11250/182612
dc.descriptionMaster's thesis in Offshore technologyno_NO
dc.description.abstractArctic exploration is one of the main trends in today’s oil and gas industry. In shallow waters jack-up mobile drilling units are often used for drilling outside the ice season. The operating period of the jack-ups is strictly limited by the ice conditions. The jack-up should be transported to the site after the ice cover has cleared sufficiently and should be moved away before the sea freezes up. A new concept of jack-up suggested by Ove T. Gudmestad (University of Stavanger) is considered in this thesis. The concept comprises a hull with icebreaking capabilities and four columnar legs placed on outrigger arms and equipped with protective collars so the jack-up can withstand ice loads in the early ice period. Drilling through one of the jack-up legs is suggested to protect the drill string from the ice impact. The leg should have a telescopic design so that the derrick could be skidded over it before drilling. The purpose of the thesis is to evaluate the feasibility of a concept suggested for extended drilling season in Arctic waters. The important design issues i.e. protective collar geometry, required air gap, telescopic leg design, collar fixation system etc. are discussed. Wave and ice loads on the jack-up legs are calculated and the possible extension of the drilling season is estimated. The benefits of the new concept and its potential applications are discussed.no_NO
dc.language.isoengno_NO
dc.publisherUniversity of Stavanger, Norwayno_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IKM/2013;
dc.subjectoffshore teknologino_NO
dc.subjectundervannsteknologino_NO
dc.subjectArcticno_NO
dc.subjectjack-upno_NO
dc.subjectdrilling rigno_NO
dc.subjectdrilling seasonno_NO
dc.subjectdesign ice loadsno_NO
dc.titleNew jack-up concept for Arctic conditionsno_NO
dc.typeMaster thesisno_NO
dc.subject.nsiVDP::Technology: 500::Marine technology: 580::Offshore technology: 581no_NO
dc.description.embargo2015-06-15


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel