Browsing Studentoppgaver (TN-IKM / TN-IMBM) by Subject "major hazard"
Now showing items 1-1 of 1
-
Risk monitoring of major hazard in single installation
(Masteroppgave/UIS-TN-IKM/2010;, Master thesis, 2010)The risk level project (RNNP) has resulted risk level trend methodology which is very useful in monitoring the trend of major hazard risk level in Norwegian shelf. However, the method cannot be used in installation level. ...