Vis enkel innførsel

dc.contributor.advisorGilje Jaatun, Martin
dc.contributor.authorGudmestad, Racin
dc.coverage.spatialNorwayen_US
dc.date.accessioned2020-09-27T18:31:10Z
dc.date.available2020-09-27T18:31:10Z
dc.date.issued2020-06-15
dc.identifier.urihttps://hdl.handle.net/11250/2679787
dc.descriptionMaster's thesis in Computer Scienceen_US
dc.description.abstractElectrical substations transform voltage from high to low, or low to high for transmission and distribution, and are a critical part of our infrastructure. The state of a substation is continuously measured for monitoring, controlling and protection purposes. The state is measured in real-time using synchrophasor measurements. The IEC 61850 standard defines communication protocols for electrical substations, including a standard synchrophasor transmission. However, IEC 61850 does not properly address cyber security, leaving critical infrastructure highly vulnerable to cyber attacks. In this thesis, a delayed integrity check for synchrophasor measurements have been developed and tested. The result shows that the solution manages to detect when integrity of the synchrophasor transmission is compromised, without adding any overhead or delay to the time-critical synchrophasor transmission itself.en_US
dc.language.isoengen_US
dc.publisherUniversity of Stavanger, Norwayen_US
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IDE/2020;
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.subjectinformasjonsteknologien_US
dc.titleDelayed Integrity Check for IEC 61850 Communicationen_US
dc.typeMaster thesisen_US
dc.subject.nsiVDP::Teknologi: 500::Informasjons- og kommunikasjonsteknologi: 550en_US


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal