dc.contributor.advisor | Ratnayake Mudiyanselage, Chandima | |
dc.contributor.advisor | Lobekk, Øystein | |
dc.contributor.author | Hølland, Øyvind | |
dc.date.accessioned | 2022-07-26T15:51:20Z | |
dc.date.available | 2022-07-26T15:51:20Z | |
dc.date.issued | 2022 | |
dc.identifier | no.uis:inspera:102983286:57131071 | |
dc.identifier.uri | https://hdl.handle.net/11250/3008686 | |
dc.description.abstract | The production of a HVAC cabin unit is about 4,1 times higher in Norway
than in the current production site in China. This is the result of a product
development for manufacturing process that have been conducted. Even with
higher shipping costs from China to Norway there is no immediate economical
benefit of moving the production from a project standpoint. There are several
non economic benefits of moving the production, including but not limited
to: Shipping costs, Carbon Footprint and sustainability, economic benefits
of the Norwegian society, Lean project execution and quality control.
There still are work to be done to improve the manufacturing process, and
reduce manufacturing costs. This thesis only covers the process to the point
of including the manufacturers and a purchaser to decrease costs. | |
dc.description.abstract | The production of a HVAC cabin unit is about 4,1 times higher in Norway
than in the current production site in China. This is the result of a product
development for manufacturing process that have been conducted. Even with
higher shipping costs from China to Norway there is no immediate economical
benefit of moving the production from a project standpoint. There are several
non economic benefits of moving the production, including but not limited
to: Shipping costs, Carbon Footprint and sustainability, economic benefits
of the Norwegian society, Lean project execution and quality control.
There still are work to be done to improve the manufacturing process, and
reduce manufacturing costs. This thesis only covers the process to the point
of including the manufacturers and a purchaser to decrease costs. | |
dc.language | eng | |
dc.publisher | uis | |
dc.title | Concept Study - Reengineering and Product Development: HVAC Cabin
Units for Ships | |
dc.type | Bachelor thesis | |