Vis enkel innførsel

dc.contributor.advisorXing Yihan
dc.contributor.authorMartirosyan Garik
dc.date.accessioned2022-09-21T15:51:23Z
dc.date.available2022-09-21T15:51:23Z
dc.date.issued2022
dc.identifierno.uis:inspera:102985146:97445219
dc.identifier.urihttps://hdl.handle.net/11250/3020279
dc.description.abstractThe work is devoted to improving the technology of drilling and well completion at the Prirazlomnoye field. Provides the basic information about the field, the geological structure of the field, well design. A comparative calculation of the parameters of the drilling mode and technical and economic indicators for the basic and advanced drilling technology is done. Calculation of the drill string and hydraulics program of the well is performed and the well completion systems were considered. The purpose of this work: Improving the efficiency of the development of the Prirazlomnoye field by improving the technology of drilling and completion of wells. Production increase, as well as a decrease in the cost of drilling wells, will be the determining factor in increasing the development of the field. This paper provides an example of how this can be achieved.
dc.description.abstract
dc.languageeng
dc.publisheruis
dc.titleImproving the technology of drilling and completion of directional and horizontal wells at the Prirazlomnoye field in order to increase the efficiency of its development
dc.typeMaster thesis


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel