Browsing Studentoppgaver (TN-IKM / TN-IMBM) by Title
Now showing items 102-121 of 1213
-
ANALYSIS OF THE METHOD OF UTILIZATION OF ASSOCIATED OF ASSOCIATED PETROLEUM GAS ON OFFSHORE PLATFORMS BY MEANS OF WATER-GAS EJECTION
(Master thesis, 2023)This master's thesis is devoted to the analysis of the efficiency of utilization of associated petroleum gas by means of water-gas ejection. Associated petroleum gas is a significant source of greenhouse gas emissions into ... -
Analytic Hierarchy Process Based Prioritization of Bending vs. Welding of piping Bends: a Technical and Economically Comparison of the Methods
(Bachelor thesis, 2021)Welding of bends to manufacture bent pipes is a well-known method used worldwide. Cold bending is a competing manufacturing method and has its advantages and disadvantages. The purpose of this thesis is to compare cold ... -
Analytical model for J-tube pull-in
(Masteroppgave/UIS-TN-IKM/2013;, Master thesis, 2013)As long as J-tubes are installed during the platform installation, only minor thing can be changed after installation. The method implies pulling the pipeline through J-shaped tubes (J-tube). In spite of the all the ... -
Anchor damage assessment of subsea pipelines - optimization of design methodology
(Masteroppgave/UIS-TN-IKM/2015;, Master thesis, 2015-06-12)The world’s energy resources on land are getting depleted, and mush attention is given to the development of offshore fields. Over the past years, new reserves located offshore have been regularly discovered. Once the ... -
AOGV: Implementation of Hydraulics to Relieve Pressure Affected Intervention Tool
(Bachelor thesis, 2023)In the following bachelor thesis options for simplification of the pressure affected intervention tool are examined. Considering industry standards and ease of use, a design of the Isolation Fasting Tool for Hydraulics is ... -
API 53, implications, challanges, consequences and advantages of implementation
(Masteroppgave/UIS-TN-IKM/2012;, Master thesis, 2012)The goal with this thesis was to look into consequences for implementing the API 53 standard for Transocean Norway. As it looks today the new requirements in the API 53 will be implemented as internal requirements within ... -
Application of a reliability centered maintenence on a drilling system
(Master thesis, 2014-06-16)The first part of the thesis is an introduction of the drilling system where the theoretical background of the drilling system is described. Then the reliability centered maintenance (RCM) methodology is described. RCM is ... -
Application of new technological solutions for improving development efficiency of the Korchagin field
(Masteroppgave/UIS-TN-IMBM/2020;, Master thesis, 2020)In this thesis oil and gas condensate Yu. Korchagin field is considered. It is located in the northern part of the Caspian Sea. Thus, production at this field is complicated by both marine production conditions and Arctic ... -
Application of risk based inspection (RBI), reliability centered maintenance (RCM) and risk based maintenance (RBM)
(Masteroppgave/UIS-TN-IKM/2013;, Master thesis, 2013)Accompanying with the development of offshore oil and gas industry, the companies’ demands on excellent QHSE achievement, high efficiency and benefit operation become increasingly high. A Well-developed maintenance strategy ... -
Application of the ISO 55000 suite for a land-based manufacturing organization
(Master thesis, 2015-06)Within several industries, including the production of agricultural equipment, recent years have been a time of organizational objectives constantly being adjusted due to failing markets and economical sanctions between ... -
Application of the ”Maintenance Loop” for land-based manufacturing
(Masteroppgave/UIS-TN-IKM/2016;, Master thesis, 2016-06-15)The maintenance function is an important part of any organization that possesses tangible assets. Whether it is machinery, buildings, equipment, or others, maintenance of these assets are vital to enable them to deliver ... -
APPLICATION OF TRACER TECHNOLOGY ON THE PRIRAZLOMNOYE OIL FIELD FOR IMPROVING THE FIELD PRODUCTION.
(Master thesis, 2021)Prirazlomnoye oil field is the only field on the Arctic shelf of Russia, where oil production has already begun. Oil production at this field is complicated by both weather and marine production conditions. Oil production ... -
Applications of condition monitoring for the subsea industry
(Masteroppgave/UIS-TN-IKM/2012;, Master thesis, 2012)With the increased interest in developing offshore fields by subsea completions, also comes the need for minimizing the non-productive time of these systems caused by unexpected failures and lengthy repairs. Maintenance ... -
Appraisal of riser concepts for FPSO in Deepwater
(Masteroppgave/UIS-TN-IKM/2014;, Master thesis, 2014-06-30)With oil and gas reserves moving into deeper waters Floating Production Units (FPUs) have been widely used for production purpose. Selection of FPU for deepwater field development is a complicated task is mainly governed ... -
Artificial island concept – specifics of construction and usage in the Caspian Sea
(Masteroppgave/UIS-TN-IMBM/2018;, Master thesis, 2018-06)The Northern Caspian Sea is considered to be a very perspective region for oil and gas production growth. However, the challenges encountered in the Northern Caspian Sea are not usually met in such combination in another ... -
Artificial lift – electrical submerged pump, best practice and future demands within subsea applications
(Masteroppgave/UIS-TN-IKM/2010;, Master thesis, 2010)One form for artificial lift that has been used for decades is Electric Submersible Pumps (ESP). Since the birth of ESP in 1926 has the technology evolved slowly and ESP used today has a lot of similarities with the ... -
Assessing slamming loads from breaking waves
(Master thesis, 2014-06-27)Recent studies show that, the load from breaking waves gives largest impact on the platform columns. If these impacts not carefully estimated and designed, they can cause a severe damage to the platform structures. The ... -
Assessing wave conditions in a Norwegian fjord
(Masteroppgave/UIS-TN-IKM/2017;, Master thesis, 2017-07-13)The focus of this thesis is to obtain an estimate of the significant wave height together with the corresponding peak period for the proposed bridge locations at Bjørnafjord. The task was conducted by modelling and ... -
Assessment method for review of existing maintenance strategies based on reliability, availability, risk, and cost parameters
(Master thesis, 2017-06)Maintaining assets is a fundamental part of any industrial facility. Oil and gas operators are often using advanced maintenance strategies, but the strategies are usually built preoperation and not systematically updated ... -
Assessment of challenges due to moisture during service life of residential buildings
(Bachelor thesis, 2021)This thesis has looked at and assessed the various challenges with moisture and moisture damage in Norwegian residential buildings.\\ In this relation, a review has been made of current statistics and reports within ...